Home >
Well Water Treatment > Iron
Out Feeder Systems > Injection
Feeder Systems
Injection Feeder System Installation Guide.
Case 1:
Irrigation rust stain prevention, well
used for irrigation only.
1. If there is no pressure tank, the
metering pump may be connected to the pump start relay for the well pump so the
the well pump and the metering pump turn on simultaneously.
2. If there is a pressure tank, the
metering pump must be connected to the controller unit for the irrigation
system. This can be done by using the pump start circuit in the controller unit
or buy installing a separate pump start relay and connecting that relay to the
controller unit.
3. Plumbing code typically requires a
back flow preventer. The metering pump injection point should be downstream of
the back flow preventer and upstream of the first zone (after the backflow
preventer and before the first zone).
Case 2:
Irrigation rust stain prevention, well
used for drinking water and irrigation:
1. The metering pump must be connected to
the controller unit for the irrigation system as discussed in case 1.
2. The metering pump injection point
should be downstream of the pressure tank, the "T" for the drinking
water line and the backflow preventer.
More specific
instructions on how to install the Rid O' Rust Injection Feeder Systems
comes in its Owners Manual. These instructions are available upon
requests. |
|